Technical library

Lifting Operations and Lifting Assurance — Authoritative Sources

Find the original source behind a lifting-assurance question, understand what authority it carries and identify what must be checked next.

Each source links to its official publisher and states its scope, access route, practical use and main limitation. The applied sections then connect those sources with equipment acceptance, proof-load testing, commissioning evidence and controlled handover.

Source status and page reviewed:

Use the source that has authority for the decision

A source can be useful without having the force of law. Primary legislation, an Approved Code of Practice, regulator guidance, industry recommended practice, a voluntary standard and a classification code each answer different questions.

Establish the governing regime

Confirm the equipment function, asset location, jurisdiction, vessel or installation status and the organisations with legal or contractual authority.

Check the current source

Verify the edition, amendments, access conditions and whether the source is current, under review, withdrawn or superseded.

Resolve the application

Use the applicable examination scheme, OEM information, Class and Flag requirements, contract and competent technical judgement to make the equipment-specific decision.

A listing in this library does not make a voluntary standard mandatory or confirm that it applies to a particular lift, item of equipment, vessel or project.

Curated authoritative sources

The library links to publisher-controlled access points. No third-party publication or proprietary matrix is copied or bundled with the website.

Great Britain legislation and HSE guidance

Start here when the activity falls within the Great Britain workplace regime. The legal text, Approved Code of Practice and guidance perform different roles and should not be treated as interchangeable.

Primary legislation

Lifting Operations and Lifting Equipment Regulations 1998

UK Government

Edition/status
SI 1998/2307, as amended
Scope
Great Britain; offshore application and territorial extent must be checked
Access
Free official text
Helps decide
Establish the statutory framework for lifting-equipment strength, positioning, marking, planning, thorough examination and reporting.
Limitation
The Regulations do not provide a lift plan, equipment-specific examination scheme or universal proof-load value.

Open the official publisher source (opens in a new tab)

Status checked

Primary legislation

Provision and Use of Work Equipment Regulations 1998

UK Government

Edition/status
SI 1998/2306, as amended
Scope
Great Britain
Access
Free official text
Helps decide
Identify the complementary duties for work-equipment suitability, maintenance, inspection, information, training and control.
Limitation
PUWER does not replace the lifting-specific requirements of LOLER where LOLER applies.

Open the official publisher source (opens in a new tab)

Status checked

Approved Code of Practice and guidance

L113: Safe use of lifting equipment

Health and Safety Executive

Edition/status
Second edition 2014; amendments 2018
Scope
Great Britain, subject to the scope stated in the publication
Access
Free official PDF; printed edition available
Helps decide
Connect the LOLER duties with practical arrangements for equipment selection, positioning, planning, examination and records.
Limitation
It is not the legislation itself and does not replace equipment-specific engineering, manufacturer information or project controls.

Open the official publisher source (opens in a new tab)

Status checked

Regulator guidance

INDG474: Lifting equipment at work — a brief guide

Health and Safety Executive

Edition/status
April 2017
Scope
Great Britain
Access
Free official PDF
Helps decide
Provide a concise introduction to selecting, positioning, planning, using and examining lifting equipment.
Limitation
It is an orientation document, not sufficient by itself for complex lifts, specialist equipment or an examination scheme.

Open the official publisher source (opens in a new tab)

Status checked

Regulator guidance

Planning and organising lifting operations

Health and Safety Executive

Edition/status
Current HSE web guidance
Scope
Great Britain
Access
Free official webpage
Helps decide
Explain proportionate planning, competent-person input, supervision and organisation for lifting operations.
Limitation
It is not a lift-plan template, competence certificate or project-specific approval route.

Open the official publisher source (opens in a new tab)

Status checked

Regulator guidance

Thorough examinations and inspections of lifting equipment

Health and Safety Executive

Edition/status
Current HSE web guidance
Scope
Great Britain
Access
Free official webpage
Helps decide
Distinguish thorough examination from inspection and explain competence, intervals, examination schemes, reports and defect action.
Limitation
It does not create the equipment-specific examination scheme or determine every required test.

Open the official publisher source (opens in a new tab)

Status checked

Offshore regulator guidance

HSG221: Technical guidance on the safe use of lifting equipment offshore

Health and Safety Executive

Edition/status
Second edition 2007
Scope
UK offshore installations and activities within the publication’s stated scope
Access
Free official PDF
Helps decide
Address lifting-equipment selection, use, examination and management in an offshore-installation context.
Limitation
Its age and scope make a current legislation, project, Class, Flag and OEM check essential; it does not generally govern ships.

Open the official publisher source (opens in a new tab)

Status checked

Marine and offshore lifting assurance

Marine and offshore work can sit under different legal, Flag, Class and contractual regimes. These sources help identify the correct boundary and coordinate lifting with vessel and simultaneous operations.

Maritime regulator guidance

MGN 332 (M+F) Amendment 4: The LOLER Regulations 2006

Maritime and Coastguard Agency

Edition/status
Published 7 January 2026; replaces Amendment 3
Scope
UK merchant ships, fishing vessels and other vessels within the notice’s stated scope
Access
Free official HTML and PDF
Helps decide
Set the UK maritime context for lifting operations and lifting equipment on vessels.
Limitation
It is not Great Britain LOLER; vessel, employment, Flag and territorial application must be established.

Open the official publisher source (opens in a new tab)

Status checked

International convention requirement

SOLAS regulation II-1/3-13: Lifting appliances and anchor handling winches

International Maritime Organization

Edition/status
Resolution MSC.532(107); in force from 1 January 2026
Scope
SOLAS ships through Flag-State implementation, subject to the regulation’s exclusions
Access
Free official amendment text; consolidated SOLAS publication is commercial
Helps decide
Identify current requirements for onboard lifting-appliance design, testing, examination, marking, operation, inspection and maintenance.
Limitation
Flag Administration, recognised-organisation and applicability decisions remain necessary, including for exclusions and existing equipment.

Open the official publisher source (opens in a new tab)

Status checked

Marine and offshore industry guidance

LR006: Guidelines for lifting operations

International Marine Contractors Association

Edition/status
Revision 2.1, June 2023
Scope
International marine and offshore operations
Access
Free official download
Helps decide
Support planning, lift categorisation, roles, equipment control, execution, records and specialist offshore lifting operations.
Limitation
It is recommended practice, not legislation, a lift-specific engineering calculation or a client procedure.

Open the official publisher source (opens in a new tab)

Status checked

Marine and offshore interface guidance

M203: Simultaneous Operations

International Marine Contractors Association

Edition/status
Revision 0.3, December 2023; technical content January 2021
Scope
International offshore marine operations
Access
Free official download
Helps decide
Structure identification, assessment and control of interfaces when lifting interacts with other offshore activities.
Limitation
It is not lifting-specific and must be used with the controlling lifting and project procedures.

Open the official publisher source (opens in a new tab)

Status checked

Industry recommended practice

Report 376: Lifting and Hoisting Recommended Practice

International Association of Oil & Gas Producers

Edition/status
Version 2, August 2022; active
Scope
International oil and gas industry
Access
Free official download after contact-form submission
Helps decide
Support organisational lifting governance, assurance questions and contractor alignment.
Limitation
It is high-level guidance rather than comprehensive technical procedures and does not replace local, company, project or OEM controls.

Open the official publisher source (opens in a new tab)

Status checked

Classification code

Code for Lifting Appliances in a Marine Environment

Lloyd’s Register

Edition/status
1 July 2026
Scope
Ships and offshore units classed or certified by LR, or where contractually adopted
Access
Official access through free Regs4ships registration
Helps decide
Identify classification requirements for design, documentation, testing, marking and survey of marine lifting appliances.
Limitation
It applies only where LR or the governing contract makes it applicable; another Class or Flag basis may control.

Open the official publisher source (opens in a new tab)

Status checked

Industry guidance and standards

Industry codes and voluntary standards can provide a recognised technical basis, but their authority depends on legislation, contract, project adoption and the actual equipment or operation.

Industry code of practice

COPSULE Version 10

Lifting Equipment Engineers Association

Edition/status
Version 10, 2026
Scope
International industry use; governing local requirements take precedence
Access
Free official online access and download
Helps decide
Provide broad safe-use, inspection and maintenance guidance across lifting-equipment families.
Limitation
It is not legislation, and its text, tables and diagrams must not be reproduced without permission.

Open the official publisher source (opens in a new tab)

Status checked

Industry guidance

LEEA-032: Guidance on Written Schemes of Examination for Lifting Equipment

Lifting Equipment Engineers Association

Edition/status
Version 2.1, July 2023
Scope
Primarily Great Britain and LOLER examination-scheme practice
Access
Official download
Helps decide
Explain the purpose, preparation and management of written schemes of examination.
Limitation
The actual scheme must be created for the equipment and circumstances by a competent person.

Open the official publisher source (opens in a new tab)

Status checked

Voluntary British Standard

BS 7121-1:2016 — Safe use of cranes: General

British Standards Institution

Edition/status
Published 31 January 2016; current and under review
Scope
United Kingdom crane operations
Access
Official abstract free; full text paid or subscription
Helps decide
Support management, planning, selection and safe use of cranes and associated responsibilities.
Limitation
It is voluntary unless adopted by the governing regime or contract; its under-review status must be checked before use or purchase.

Open the official publisher source (opens in a new tab)

Status checked

Voluntary British Standard

BS 7121-2-1:2012 — Inspection, maintenance and thorough examination: General

British Standards Institution

Edition/status
Published 30 November 2012; current
Scope
United Kingdom crane inspection and examination
Access
Official abstract free; full text paid or subscription
Helps decide
Support crane pre-use checks, inspection, maintenance, thorough examination and supplementary testing.
Limitation
It does not cover every type of lifting equipment, and equipment-specific BS 7121 subparts may also apply.

Open the official publisher source (opens in a new tab)

Status checked

Voluntary international standard

ISO 12480-1:2024 — Cranes: Safe use: General

International Organization for Standardization

Edition/status
Edition 2, August 2024; published
Scope
International crane operations within the standard’s stated scope
Access
Official abstract and sample free; full text paid
Helps decide
Support safe systems of work, task planning, crane selection, operation and personnel arrangements.
Limitation
It excludes some crane types and is not jurisdictional law; national, Flag, Class, contract and OEM requirements remain controlling.

Open the official publisher source (opens in a new tab)

Status checked

How I use a lifting-equipment or LOLER matrix

I principally use a lifting-equipment or LOLER matrix when planning or reviewing proof-load testing, determining examination and certification requirements, accepting equipment and accessories into the project register, and checking whether a proposed test route is appropriate for the equipment type.

The matrix is a structured prompt. It can help identify:

  • the proof-load or test requirement that may need confirmation;
  • the type and extent of examination;
  • the certification and traceability expected for the equipment;
  • whether competent-person, third-party, Class or other witnessing is required by the applicable regime;
  • whether the available evidence supports acceptance for the intended use.

Before accepting lifting equipment

Acceptance should connect the physical item to its approved configuration, current status and controlled evidence. The applicable regime determines which records and approvals are required.

  • Confirm that the manufacturer or equipment nameplate is present and readable.
  • Record the manufacturer, model and serial number where applicable.
  • Confirm the unique equipment identification.
  • Check the SWL or WLL marking, as applicable.
  • Confirm capacity for the intended configuration and use.
  • Check that equipment and accessory markings remain legible.
  • Match the physical identity to the certificate and register entry.
  • Confirm entry in the controlled lifting-equipment register.
  • Confirm the current examination status.
  • Review the current thorough-examination report or equivalent.
  • Review the proof-load or test certificate where required.
  • Identify stated limitations, conditions and outstanding observations.
  • Confirm that reportable defects have been formally cleared before return to service.
  • Check the requirements of the approved examination scheme.
  • Confirm third-party or competent-person certification where required.
  • Confirm Class or Flag acceptance and register entry where applicable.
  • Check calibration status for load cells, test equipment and measuring instruments relied upon.
  • Establish traceability between the equipment, accessories, examination records and turnover documentation.

Third-party witnessing, Class certification and proof loading are not automatic requirements for every item. They apply where required by the legal regime, examination scheme, Class, Flag, client or project.

Separate lift readiness from proof-load-test hold points

Ordinary lift readiness and proof-load testing are different control situations. General lift readiness should confirm the approved plan, load and lifting-point information, equipment status and configuration, operating conditions, roles, communications, interfaces, exclusion arrangements and stop criteria required by the governing procedure.

My non-negotiable hold points for proof-load testing

  • The test area is cleared.
  • An effective barricade and controlled exclusion zone are established.
  • Strict no-entry controls are in force.
  • The equipment applying and measuring the test load is correctly rated.
  • Load-measuring and test equipment is calibrated and certified.
  • The intended test load has been verified against the applicable requirement.
  • Equipment identity and configuration match the approved test procedure.
  • No visible or recorded fault is present that could affect load capacity or safety limits.
  • Required permits, communications, witnessing and emergency arrangements are confirmed.
  • Everyone involved understands who has authority to stop the test.

A visual inspection alone does not establish structural integrity or fitness for proof-load testing. The hold point can be released only through the approved procedure and by the authority defined for the test.

Routine, non-routine and complex lifts

Lift categorisation determines the level of planning, engineering review, risk assessment, competence, supervision, approval, communication, contingency planning and SIMOPS control. The descriptions below are qualitative working distinctions, not universal legal definitions.

Routine

A repeated or familiar lift performed within an established procedure, known configuration and defined operating limits.

Non-routine

A lift involving an unfamiliar arrangement, changed conditions, an unusual load or configuration, restricted access, or circumstances not fully covered by the routine procedure.

Complex or critical

A lift with significant technical complexity, multiple interfaces or elevated consequences requiring a specifically engineered and independently reviewed plan.

The governing project procedure must define the actual categories, terminology, thresholds and approval routes. Do not invent a category from load percentage alone or override the definitions required by the applicable regime.

Control SIMOPS and lifting interfaces

Lifting may interact with commissioning, construction, marine operations, vessel activities, vendors and the receiving operations team. The control objective is to prevent one group from changing the conditions relied upon by another.

  • Identify interfaces during advance planning.
  • Coordinate the work through the required planning and SIMOPS meetings.
  • Confirm the permit-to-work basis and responsible authorities.
  • Agree the sequence, timing and any deferred activities.
  • Define lifting, commissioning and system boundaries.
  • Establish controlled exclusion zones with visible signs, barriers and status identification.
  • Agree the communication method, command structure and responsible people.
  • Confirm isolation, energisation and equipment-status conditions.
  • Review nearby work that could affect the lift or its supporting systems.
  • Give every work group clear stop-work authority.
  • Record decisions, constraints, changes and deferred work.

Preserve as-found evidence when a defect is identified

When equipment condition may affect safety or capacity, the immediate purpose is to prevent further use while preserving reliable evidence. Recording the defect does not make the equipment acceptable.

  1. Control the item. Stop the activity where required, then isolate, quarantine or tag the equipment and prevent unauthorised adjustment, repair or return to service.
  2. Record the as-found state. Capture the equipment identity, configuration, visible damage, relevant readings and controlled photographs where permitted.
  3. Raise the controlled record. Record the issue on the applicable ITR and raise the required observation, punch item, defect report or NCR. Update the examination record and equipment-register status where appropriate.
  4. Determine the disposition. The authorised technical, competent-person, OEM, Class or project authority decides the repair, replacement, further assessment and examination route.
  5. Demonstrate return to service. Retain repair evidence, re-examination or re-certification, acceptance and the formal status change linking the physical item, register and turnover record.

An observation added to a certificate is evidence that an issue was recorded; it is not evidence that the defect was technically resolved.

Resolving conflicting requirements

A project should define its governing hierarchy of precedence. There is no safe universal order for every jurisdiction and contract, and “apply the most stringent requirement” is not a complete resolution: requirements may address different subjects, or combining them may produce an invalid test or configuration.

  1. What jurisdiction governs the equipment and activity?
  2. Which national and local legal requirements apply?
  3. Do Flag or Class requirements apply?
  4. What does the contract define as the hierarchy of precedence?
  5. What does the approved examination scheme require?
  6. What are the OEM’s stated limits and instructions?
  7. Are the referenced standards current?
  8. Are two requirements genuinely conflicting, or do they address different subjects?
  9. Has the conflict been referred to the appropriate technical, legal, Class or client authority?
  10. Is the agreed resolution formally approved and recorded?
  11. Have the lift plan, procedure, register and certification records been updated consistently?

Commissioning and handover evidence

For construction completion and commissioning, the record should show what was tested, in which configuration, against which acceptance basis and with what result. Relevant evidence may include:

  • the approved commissioning or test procedure;
  • the lifting or proof-load test plan;
  • relevant permits and risk controls;
  • the equipment-register entry;
  • equipment and accessory certificates;
  • thorough-examination reports;
  • calibration certificates;
  • ITRs and test sheets;
  • as-found and as-left results;
  • actual test readings and load data;
  • witness and acceptance signatures;
  • photographs where required and permitted;
  • defects, observations, punch items and NCRs;
  • technical dispositions and repair evidence;
  • re-examination or re-certification;
  • approved deviations;
  • Class, Flag, client or third-party acceptance where required;
  • final status in the commissioning and handover system;
  • traceability into the turnover dossier.

A pass/fail tick alone is not adequate where actual readings, equipment identity, configuration or acceptance conditions are material to the handover decision.

Anonymised lifting-equipment failure patterns

These examples identify assurance questions only. They do not describe a named client, project, location, cause, repair, result or outcome.

Corrosion affecting crane-boom condition

Does the observed condition remain within the certified and examined basis? What assessment, measurements and competent technical decision are needed before the equipment can be accepted?

Unauthorised structural repair or modification

Has the change invalidated design, examination or traceability assumptions? Which engineering approval, inspection, testing and re-certification route now applies?

Hydraulic safety or control function bypassed

Has a protective function been defeated to compensate for wear or degraded performance? What evidence is required to restore the designed function and demonstrate safe return to service?

NSL/ASCO lifting-equipment matrix status

The current lifting-equipment or LOLER matrix has been requested directly from ASCO Lifting Assurance. As of 31 July 2026, an official response, current edition and redistribution position remain pending.

The website therefore does not host or reproduce a matrix, copy its classifications or proof-load tables, link to an unofficial mirror, publish an older edition as current, or imply that ASCO has authorised redistribution.

View ASCO’s official Safety Products and Handbooks page (opens in a new tab)